FACTORY 3
Available platform for business launching and its scaling up
- production allocation of medium and large companies;
- assembling division of industrial enterprises;
- logistics or warehouse;
- research and development (R&D).
Power supply:
on-sitesubstation
630 kVA.
Water supply and
sewage:
connected to the city pipeline.
Heating and ventilation:
adjustable to client’s
technological needs.
FACTORY3 meets the requirements of BREEAM, the British method that identify building’s compliance to energy efficiency, environmental safety and decent working conditions.
In reality, this means that a producer has the resources to increase employees’ productivity, control and reduce operating costs.
Also, production can be certified under OHSAS 18001 and ISO 9001 that makes products competitive worldwide.
Transport accessibility and infrastructure
-
Roads
(E95) Helsinki – Kyiv – Odessa – Dimitrovgrad – Alexandroupolis, distance – 0,9 km.
(R32) Kremenets – Bila Tserkva, distance – 0,6 km.
-
Railway
Railway track on the territory of the industrial park.
Railway station ‘Rotok’, distance – 0,5 km.
-
Airports
Boryspil International Airport (KBP), distance – 120 km.
‘Kyiv’ International Airport (IEV), distance – 90 km.
Bila Tserkva cargo aviation terminal, distance – 14 km.
-
Customs
14,5 km to the Bila Tserkva customs office.
550 km to the EU border.
-
Sea Ports
400 km to Odesa and Mykolaiv sea trade port